Cleaning

Post-renovation cleaning

We quote by phone: the price depends on the property, scope and timing

Leave a request

We clean apartments and houses after renovation: removal of construction debris and packaging, cleaning of all surfaces, windows and frames, removal of paint, adhesive, grout haze and plaster residue, and washing of ventilation grilles and radiators.

Why two passes

Construction dust is fine gypsum and cement. It stays airborne for hours and settles again on everything already cleaned. A single pass looks perfect until the next morning, when a grey film reappears on the windowsills and the tops of doors. So we do a rough pass with debris removal and a finishing pass the following day, once the air has cleared. Anyone offering a single pass the day the builders leave is selling you a result that lasts twelve hours.

What is easy to damage

New surfaces are vulnerable and expensive to replace: matt fronts, quartz worktops, painted walls, taps with a coated finish, glass with protective film still on it, and newly laid parquet. We use products matched to each surface rather than an abrasive for everything, which is the usual way a new finish gets scratched in the last stage of a renovation.

What is often missed

Grout haze on tiles, which hardens if left; dust inside sockets and switch boxes; the tops of door frames and kitchen units; adhesive residue on glazing; construction dust inside the ventilation system and in the new air conditioner, which then blows it back into the room.

Working alongside the builders

We can do the rough pass while finishing work continues, but the final pass should follow the last dusty job, otherwise it is wasted. We coordinate with the crew rather than arriving on a fixed date.

Price

By area and the amount of residue. We give a range by phone after a few questions and confirm on arrival.

How we work

  1. 1Request
  2. 2Scope assessment
  3. 3First pass
  4. 424-hour pause
  5. 5Second pass

Frequent questions

Why is it done twice?

Because construction dust settles again within a day. One pass looks clean only until the next morning.

Can you clean while some work continues?

We can do a rough pass, but the finishing pass should follow the last dusty job, otherwise it is wasted.

Will new surfaces be damaged?

Not if the products match the surface. Matt fronts and quartz are the ones most often ruined by abrasives.

What gets missed most often?

Grout haze, dust inside sockets, the tops of frames and units, and dust inside the ventilation and the new air conditioner.

Do you take the debris away?

Yes, removal of construction debris and packaging is part of the first pass.