Batumi and Adjara

Construction

We quote by phone: the price depends on the property, scope and timing

Leave a request

We build private houses, guest properties and small apart-buildings in Adjara and across Georgia: design, permit, foundation, structure, engineering and finishing. We have been working since 2014, and we do not start without a permit — legalising a finished house costs more and takes longer than doing it in order.

What we build

Ground and water come first

Most plots here are either close to the sea with a high water table or on a slope. Both decide the budget before the architecture does. By the water it means a geological survey, a slab or piles, plinth waterproofing and drainage around the house, and usually no basement: doing one properly costs more than building the same area above ground. On a slope it means a retaining wall with reinforcement and drainage outlets, built before the excavation — once the house stands, machinery can no longer reach the slope.

We check all of this before the sketch, not after the excavation, because that is where projects go over budget. Where you have not bought the plot yet, we check the zone, the building coefficient, the access for machinery and the distance to utilities before the deposit.

Documents

Architectural design, municipal permit, commissioning and the registry update are on us. For an extension or an added floor we start with a structural survey: a trial pit at the foundation, walls and floors, so the engineer can calculate what the existing building will carry.

Timing

Design and permit one to three months, foundation three to six weeks, structure with roof three to four months, engineering and finishing another three to five. A timber frame house can be closed within a single warm season. In the mountains the wet processes run roughly from May to October, and we plan around that window.

Price and warranty

The same house costs differently on flat ground and on a slope, so we quote a range by phone and prepare an itemised estimate after visiting the plot. Payments are released against completed stages, never in advance. Warranty: five years on the structure, three on concealed engineering, two on finishes.

Where we work

Batumi and Adjara, Kobuleti, Gonio, the Guria coast, the mountain municipalities and the large cities. A finished house can be furnished from our own workshop and placed under upkeep while you are away.

How we work

  1. 1The call
  2. 2Plot check
  3. 3Design and estimate
  4. 4Permit
  5. 5Foundation and shell
  6. 6Engineering and finishing
  7. 7Handover

What we do

House construction

House construction

Private houses in block with a monolithic frame: geology, foundation, structure, engineering and finishing. Five-year warranty on the…

Extensions and added floors

Extensions and added floors

Extending an existing house with a structural survey and full documentation, including the change of area in the…

Commercial construction

Commercial construction

Guest houses, small hotels and apart-buildings: layout planned from the economics, not from the square metres.

Facades and roofing

Facades and roofing

Roofs, gutters and facade systems built for two thousand millimetres of rain, salt air and horizontal storms.

Timber frame houses

Timber frame houses

A house closed within one warm season: lighter structure, simpler foundation, easier delivery to difficult plots. Kiln-dried timber…

Retaining walls and slopes

Retaining walls and slopes

Terracing, retaining structures and drainage. On a slope this is structural work, and it comes before the excavation.

Fences and landscaping

Fences and landscaping

Fences, driveways, paths, drainage and outdoor lighting — the part of a plot that decides how it looks…

Reconstruction

Reconstruction

Rebuilding old houses and changing a building's use: survey first, then two estimates — rebuild or demolish and…

Landscaping works

Landscaping works

Terraced gardens, lawns, planting, irrigation and path lighting for a subtropical plot that grows fast all year.

Where we work

Our projects

Frequent questions

Do you handle the permit?

Yes: design, municipal approval, commissioning and the registry update. We do not build without a permit.

How long does a house take?

One to three months for design and permit, then seven to nine months of works. A timber frame house can be closed in one warm season.

Why start with a geological survey?

Because the foundation type and the cost of the retaining works are decided by the ground, not by the drawings. It is the most cost-effective line in the estimate.

Can you check a plot before I buy it?

Yes: zone and building coefficient, slope, ground and water, access for machinery and the distance to utilities.

Can I build a basement?

Near the sea it is usually the wrong call: proper waterproofing costs more than the same area above ground. We give both estimates and let you decide.

Can I follow the build from abroad?

Yes: photo and video every week, stage acceptance by video call, payments only against completed stages.