Request a call back

We will call back during working hours

Right after sending, your phone will dial the company number so you can discuss the price by voice. By pressing the button you agree to the data processing policy.

Batumi and Adjara

Renovation

We quote by phone: the price depends on the property, scope and timing

Leave a request

We have been renovating apartments, houses and commercial spaces in Adjara and across Georgia since 2014. About half of our clients live in another country, so the whole project runs remotely: a contract signed online, photographs and video every week, payments released against completed stages.

What we do

What the coastal climate changes

Adjara receives over two thousand millimetres of rain a year, humidity stays above seventy percent and the sea air carries salt. In practice that means full waterproofing in wet rooms, extraction with a humidity sensor and fresh air intake, hardware with anti-corrosion coating, and moisture-resistant materials in furniture and joinery. Solutions that work in a dry climate fail here within two or three seasons, and we say so before the estimate rather than after.

In older buildings the first thing we open up is the engineering. Aluminium wiring on twists and cast iron risers will not carry a water heater, an air conditioner and a hob, and finishing over them means redoing the work within a couple of years. We show you the condition before the estimate so the decision is made with the facts in view.

How we work remotely

The contract is signed online. Every week you receive photographs and video of what was done. Concealed work — pipework, waterproofing, screed — is filmed before it is closed up, and the footage stays with you. Payments are released against completed stages rather than in advance. We accept keys from the developer and hand them to you or to your first guests.

Timing

A white frame takes six to eight weeks, a black frame ten to fourteen, cosmetic work in an older flat two to four. A house takes two to four months depending on the survey. Summer runs longer: crews are busy and deliveries slow down. The schedule with dates is an annex to the contract.

Price and warranty

We quote a range by phone after five short questions about condition, area, scope and timing. The itemised estimate follows a free site visit and is fixed in the contract, so it does not grow along the way. Warranty: two years on finishes, three on concealed engineering, five on structure.

Where we work

Batumi and the whole of Adjara — Batumi, Kobuleti, Gonio, Chakvi, Kvariati — plus the Guria coast, the mountain resorts and the large cities. Renovation is usually followed by custom furniture, outfitting for rental and property management: one team from the first measurement to the first guest.

How we work

  1. 1The call
  2. 2Free survey
  3. 3Itemised estimate
  4. 4Contract
  5. 5Rough works
  6. 6Finishing
  7. 7Handover and warranty

What we do

Apartment renovation

Apartment renovation

Renovation of apartments from a black or white frame and in older buildings: layout, engineering, finishing. Contract with…

House renovation

House renovation

Renovation and reconstruction of private houses: roof, plinth, engineering, interiors. We start with the building envelope, not with…

Commercial interiors

Commercial interiors

Renovation of shops, offices, cafes and service spaces: schedule built backwards from the opening date, penalties for delay…

Turnkey renovation

Turnkey renovation

From the first measurement to the keys: design, works, furniture, appliances and textiles. One contract, one team, one…

Interior design project

Interior design project

Layout, visualisation and a working specification you can build from: dimensions, materials, lighting and outlet plans, not just…

Electrical works

Electrical works

Full rewiring, distribution boards, outlets, lighting and connection of appliances. Calculated for the real load, not for the…

Plumbing works

Plumbing works

Water supply and drainage, manifolds, water heaters, connection of appliances. Everything that leaks later is decided at this…

Tiling

Tiling

Tiling of bathrooms, kitchens, terraces and large format porcelain: setting-out, waterproofing underneath, even joints and sealed cuts.

Plastering and screed

Plastering and screed

Levelling walls and floors: beacons, plaster, screed with the right falls. Everything installed afterwards depends on this stage.

Ceilings

Ceilings

Suspended, multi-level and stretch ceilings with recessed lighting and hidden LED coves. Wiring and access are planned before…

Windows and balcony glazing

Windows and balcony glazing

Panoramic glazing, balcony enclosures and window replacement: calculated for wind load, fitted with anti-corrosion hardware.

Heating and air conditioning

Heating and air conditioning

Underfloor heating, radiators, boilers and split systems: routes laid during the renovation, capacity calculated for the actual rooms.

Turnkey bathroom renovation

Turnkey bathroom renovation

A bathroom from strip-out to hanging the mirror: waterproofing, plumbing, tiling, furniture and lighting under one contract.

Sound insulation

Sound insulation

Insulating walls, ceilings and floors from neighbours and street noise: a proper build-up with decoupling, not a thin…

Smart home

Smart home

Smart locks, lighting scenarios, climate control and leak sensors that shut off the water. Especially useful when the…

Layout changes and approvals

Layout changes and approvals

Moving or removing partitions with a structural check and full documentation, including the change in the public registry.

Where we work

Our projects

Frequent questions

How much does renovation cost?

We quote a range by phone after five short questions. The itemised estimate follows a free site visit and is fixed in the contract, so it does not grow along the way.

Do you work with owners living abroad?

Yes, that is about half of our clients. Contract online, photo and video every week, concealed work filmed, payments against completed stages.

How long does it take?

Six to eight weeks from a white frame, ten to fourteen from a black one, two to four for cosmetic work, two to four months for a house.

What about the warranty?

Two years on finishes, three on concealed engineering, five on structure. If something leaks or comes loose, we return and redo it at our own cost.

Do I have to replace the wiring in an older flat?

If you plan a water heater, air conditioners and a hob, yes. We open it up and show the condition before the estimate rather than after.

Can renovation and furniture run in parallel?

Yes, and it is the usual approach: furniture is produced while finishing continues, so the kitchen arrives right after the tiling.