We lay tiles and large format porcelain in bathrooms, kitchens, hallways, terraces, stairs and pool surrounds. Before any tile goes on, the wet room is waterproofed — tiling over bare screed is how flats flood their neighbours two years later.
Setting-out is agreed before work starts
Where the cut tile lands, how the joints line up with the shower drain, whether the rows align around the door and the window reveal, where the pattern starts on a feature wall: these are decided on a drawing, not improvised on the wall. A tiled bathroom that looks wrong usually has a setting-out problem, not a tile problem, and by then it cannot be fixed without stripping it.
What the substrate has to be
Large format porcelain shows every deviation, so the wall is levelled with plaster and the floor screed has to be dry and flat before laying. We measure residual moisture rather than working to a calendar: tiles laid over damp screed lift later and take the adhesive with them.
What this climate requires
Waterproofing across the whole wet zone with the wall-to-floor junction reinforced and tested before tiling. Grout suited to constant humidity, because ordinary grout darkens and grows mould in corners within a season here. Sealed cuts on terraces and balconies so water does not get under the tile and lift it in winter. And falls to the drain that actually work, checked with water rather than by eye.
Timing, price and warranty
A bathroom takes about a week to ten days including waterproofing and drying time. Priced per square metre with the format, the pattern and the complexity of the cuts taken into account. Warranty: two years on finishes, three on the waterproofing underneath.