We build guest houses, small hotels and apart-buildings: design, permit, structure, engineering and finishing, ready for the first guests.

Layout from the economics

The number of rentable units, not the total area, decides what the building earns. Six modest rooms with their own bathrooms often outperform four spacious ones, and an extra bathroom usually pays for itself faster than an extra ten square metres of bedroom. We work this through with you using the figures from the properties we manage nearby, before the architecture is fixed rather than after.

What is designed differently from a house

Hot water for simultaneous draw-off rather than for one family — this is the single most common complaint in reviews of small properties here. Electrical capacity for peak season, when every air conditioner runs at once. Sound insulation between units, because guests return at different hours. Separate entrances where the format allows. And storage for linen, consumables and cleaning equipment, which is always forgotten on the plan and always needed from day one.

The details that show up in reviews

A place for suitcases in every room, hooks in the bathroom, sockets by the bed, blackout curtains, and somewhere to dry things. None of them costs much at design stage and all of them appear in guest ratings. We put them on the plan rather than leaving them to the furniture stage.

Timing and the season

Design and permit one to three months, then seven to nine months of works. A seasonal property should be finished in April, not in June: bookings, outfitting and photography all need time before the season starts, and a property that opens mid-season loses most of its first year.

Price and warranty

We quote a range by phone and give an itemised estimate after visiting the plot. Payments against completed stages, weekly photo report. Warranty: five years on the structure, three on concealed engineering.

How we work

  1. 1The call
  2. 2Plot and concept
  3. 3Design
  4. 4Permit
  5. 5Construction
  6. 6Commissioning and opening

Frequent questions

How many rooms should I build?

We calculate from the economics and the season, not from the area. Often more small rooms with their own bathrooms earn more than fewer large ones.

What is most often underestimated?

Hot water and electrical capacity at peak. Both are designed for simultaneous use, otherwise they fail in July.

When must it be ready?

For a summer property, April. Bookings, outfitting and photography need time before the season starts.

What do guests actually complain about?

Hot water, noise between rooms and nowhere to put a suitcase. All three are layout decisions, not furniture ones.

Can you also run the property afterwards?

Yes, outfitting and management continue with the same team, so the building opens with bookings rather than after them.