We extend existing houses: a room, a terrace, a second floor or a separate guest building on the same plot. Every project starts with a survey, because the question is not what you want to add but what the existing structure will carry.

The survey comes first

A trial pit at the foundation to see its depth and condition; the state of walls and floors; whether there is a reinforced belt; how the existing structure is loaded and where. From that a structural engineer calculates whether an added floor is possible at all and what strengthening it needs. The answer is sometimes uncomfortable: on an old house without a reinforced belt an added floor may require work on the foundation that costs more than the new floor itself.

Extension or separate building

A separate building on the same plot often wins: no strengthening of the existing structure, no disturbance to the house while you live in it, simpler registration, and an independent foundation sized for the new load. We price both and explain the trade-offs rather than defaulting to the larger job.

Joining old to new

Where an extension does go ahead, the junction between old and new is the part that fails. Different foundations can settle differently, so how the two parts are connected — a movement joint, a tied connection or a separate structure alongside — is decided by the structural engineer from the survey and calculations, and the roof and drainage are joined so water is not funnelled into the wall between them. Most of the extension defects we are called to fix are at that line.

Documents

Any change of area or volume requires approval and an update in the public registry. An unregistered extension lowers the value of the property, complicates a bank valuation and surfaces at sale, so we handle the paperwork as part of the project rather than leaving it to you afterwards.

Timing, price and warranty

An extension takes two to four months, the approval one to three, and they can partly overlap. We quote a range by phone and give an estimate after the survey. Warranty: five years on the structure.

Light extensions on metal frames are covered on the steel-frame extensions and aluminium extensions and verandas pages.

How we work

  1. 1The call
  2. 2House inspection
  3. 3Design and calculation
  4. 4Documents
  5. 5Foundation and frame
  6. 6Junctions and finishing

Frequent questions

Will the house carry a second floor?

That is what the survey answers: foundation, walls, floors, reinforced belt. The engineer then calculates any strengthening needed.

Extension or separate building?

Often the separate building: no strengthening of the existing structure and simpler registration. We price both.

Is approval required?

Yes, any change of area is approved and recorded in the registry. We do this ourselves.

Where do extensions usually fail?

At the junction with the old house. Different foundations settle differently, so the joint and the drainage above it have to be designed, not improvised.

Can we live in the house during the works?

Usually yes for a separate building, and partly for an extension. We plan the stages around it.