Request a callback

We will call back during working hours

By sending the form you agree to our privacy policy. We reply during working hours.

Anaklia

Handover inspection and site supervision in Anaklia

We quote by phone: the price depends on the property, scope and timing

Leave a request

We accept flats and houses from developers in Anaklia and provide technical supervision over renovation and construction carried out by others. We come with instruments: thermal camera, moisture meter, laser level, spirit level, socket tester. Every finding is recorded with a photograph and a measurement, and the report follows within a day.

What we check at handover

Geometry of walls, floors and ceilings and deviations from level; windows and glazing — junctions, draughts, the working of the hardware; water, drainage and electrical outlet positions against the drawings; waterproofing of bathrooms and balconies, moisture in the structures; ventilation and draught, the state of the board and the earthing; the actual floor area against the area in the contract.

What we find in Anaklia

The coast here is flat, sandy and open, and the water table is high. That gives two recurring findings. The first is moisture in the plinth and on the ground floors: it is not visible to the eye, but a thermal camera and a moisture meter show it at once, and it will emerge a season later as finishes coming away. The second is wind load: glazing and roofs installed in the standard way start to let wind and water through at the first strong squall off the sea.

A separate theme is the market itself. It is only taking shape, some properties are built with an eye to the future development of the zone, and the quality of work varies a great deal between developers. So an inspection here is not a formality but a way of understanding what you are paying for.

Supervision of renovation and construction

If another crew is doing the work and you live in a different country, we come at the key stages before concealed work is closed up: pipe and cable runs, waterproofing, screed, conformity with the estimate and the specified materials. A report after every visit. Usually four to six visits for an apartment and more for a house.

How it works and how long it takes

A request, a date for the visit, a check against the checklist, the report within a day, and a repeat visit after the defects are corrected. An apartment takes two to three hours, a house with its plot longer.

Price

The inspection is priced by the property’s floor area, supervision by the number of visits. We give the figure by phone straight away; there are no complicated estimates here.

When an inspection pays for itself fastest

Before the acceptance act is signed and before a purchase. Until the act is signed, correcting the defects is the developer’s obligation. And on the resale market a report with measurements and photographs is an argument in negotiation: what is found at the inspection often reduces the price by more than the inspection costs.

All services in the village: Anaklia — construction, custom furniture, outfitting for rent, management, cleaning. General terms: site supervision and handover inspection.

How we work

  1. 1Request
  2. 2Visit with instruments
  3. 3Checklist inspection
  4. 4Report with photos
  5. 5Re-inspection after the fixes

The same service in other cities

All about the service: Property inspection and site supervision

Frequent questions

Why is moisture the first finding here?

The coast is flat and sandy with a high water table. Instruments show damp in the plinth and ground floors long before finishes start coming away.

What does the wind do to standard glazing?

It starts to let wind and water through at the first strong squall off the sea, and the same applies to a standard roof installation.

Why does an inspection matter more in a new market?

Quality varies a great deal between developers here, so the inspection is how you find out what you are paying for.

When does an inspection pay for itself fastest?

Before the act is signed, while defects are the developer's obligation, and before a resale purchase as an argument in negotiation.

How long does it take?

Two to three hours for an apartment, longer for a house with its plot, with the report within a day.