Request a callback

We will call back during working hours

By sending the form you agree to our privacy policy. We reply during working hours.

Sarpi

Handover inspection and site supervision in Sarpi

We quote by phone: the price depends on the property, scope and timing

Leave a request

We accept flats and houses in Sarpi and provide technical supervision over renovations and construction carried out by others. We come with a thermal camera, moisture meter, laser level and socket tester, and deliver the report with photographs within a day. Thirty minutes from our base in Batumi.

What we check

Geometry of walls and ceilings and deviations from level; glazing and terraces — junctions, draughts, fixings; waterproofing of bathrooms and balconies and moisture in the structures; roof, gutters and the state of external elements; distribution board, earthing, ventilation and draught; the plot on the slope — retaining structures and drainage.

What we find in Sarpi

This is the closest development to the water in Adjara, and salt works harder here than anywhere. At the inspection it shows in the fixings: ordinary galvanised fittings on railings, canopies and the glazing subframe start to corrode within two or three seasons. We check the fixing points and the material of the fasteners separately.

The second theme is the terrain. The plots are narrow and the slope comes right up to them, so we look at the retaining structures and the drainage: a bowed wall with no drainage outlets is the most expensive finding in the village. The third is glazing and terraces, which start to leak into the room below in driving rain.

Supervision of works

We come at the key stages before concealed work is closed up, check the pipe and cable runs, the waterproofing and conformity with the estimate, with a report after every visit.

Timing and price

An apartment takes two to three hours, a house with its plot longer. The report follows within a day. The inspection is priced by floor area, supervision by the number of visits; we give the figure by phone.

Pre-season inspection

For rental properties we do a short check in spring: engineering, air conditioners, water heater, waterproofing of wet areas, the state of the terrace and the railings. An hour of work and a clear idea of what will last until September.

All services in the village: Sarpi — renovation, construction, custom furniture, outfitting, management, cleaning. General terms: site supervision.

How we work

  1. 1Request
  2. 2Visit with instruments
  3. 3Checklist inspection
  4. 4Report with photos
  5. 5Re-inspection after the fixes

The same service in other cities

All about the service: Property inspection and site supervision

Frequent questions

Why check the fixings so carefully here?

This is the closest development to the water in Adjara. Ordinary galvanised fittings corrode within two or three seasons.

What is the most expensive finding in the village?

A bowed retaining wall with no drainage outlets.

How long does an inspection take?

Two to three hours for an apartment, longer for a house with its plot. The report comes within a day.

What does the spring check cover?

Engineering, air conditioners, water heater, waterproofing of wet areas, terrace and railings — about an hour.

Do you supervise construction as well as renovation?

Yes, at the key stages before concealed work is closed up, with a report after each visit.