Bobokvati

Construction in Bobokvati

We quote by phone: the price depends on the property, scope and timing

Leave a request

We build private houses, guest properties and small apart-buildings in Bobokvati: design, permit, foundation, structure, engineering and finishing. Thirty-five minutes from our base in Batumi.

Foundation and plinth decide how long it lasts

Development here sits close to the water and the water table is high, so geology comes before the sketch: it determines whether a slab or piles are needed, how deep, and how the drainage around the house is arranged. Money saved on the survey comes back as damp walls within two years, and by then the fix means excavating around a finished building.

Salt from the first day

External structures, fixings, railings and the framework for glazing are specified for a marine climate from the start. On the first line ordinary galvanised fittings corrode at the fixing points within a few seasons, and reaching them later means removing cladding or opening finishes. It costs very little at specification stage.

Designing for a property that stands empty

Most buildings here are used seasonally, so the design has to account for six months of closure in high humidity: a ventilated roof build-up, fresh air intake that works without anyone present, and finishes that tolerate a cold, damp winter indoors. This is planned at design stage rather than solved by a dehumidifier later.

Documents, timing and warranty

Design, permit, commissioning and the registry entry are on us. Design and permit one to three months, then seven to nine months of works. A seasonal property should be finished in April. Five-year warranty on the structure.

All services: Bobokvati.

How we work

  1. 1Plot and documents
  2. 2Design and estimate
  3. 3Foundation and shell
  4. 4Engineering and finishing
  5. 5Handover

Services: Construction in Bobokvati

House construction

House construction

Private houses in block with a monolithic frame: geology, foundation, structure, engineering and finishing. Five-year warranty on the…

Extensions and added floors

Extensions and added floors

Extending an existing house with a structural survey and full documentation, including the change of area in the…

Commercial construction

Commercial construction

Guest houses, small hotels and apart-buildings: layout planned from the economics, not from the square metres.

Facades and roofing

Facades and roofing

Roofs, gutters and facade systems built for two thousand millimetres of rain, salt air and horizontal storms.

Timber frame houses

Timber frame houses

A house closed within one warm season: lighter structure, simpler foundation, easier delivery to difficult plots. Kiln-dried timber…

Retaining walls and slopes

Retaining walls and slopes

Terracing, retaining structures and drainage. On a slope this is structural work, and it comes before the excavation.

Fences and landscaping

Fences and landscaping

Fences, driveways, paths, drainage and outdoor lighting — the part of a plot that decides how it looks…

Reconstruction

Reconstruction

Rebuilding old houses and changing a building's use: survey first, then two estimates — rebuild or demolish and…

Landscaping works

Landscaping works

Terraced gardens, lawns, planting, irrigation and path lighting for a subtropical plot that grows fast all year.

The same service in other cities

All about the service: Construction

Frequent questions

Why is geology needed on a flat plot?

Because the water table decides the foundation. Close to the sea, flat ground is not simple ground.

Why do fixings and railings need special specification?

Salt corrodes ordinary galvanised fittings at the fixing points within a few seasons on the first line.

When should the build finish?

April for a seasonal property, so outfitting and photography are done before the season.

How do you design for six months of closure?

Ventilated roof, intake that works unattended, and finishes that tolerate a damp winter indoors. Planned, not retrofitted.

Can I build a basement?

With this water table it is rarely justified. We give both estimates and let you compare.