Chakvi

Construction in Chakvi

We quote by phone: the price depends on the property, scope and timing

Leave a request

We build private houses, guest properties and small apart-buildings in Chakvi: design, permit, foundation, structure, engineering and finishing. Twenty minutes from our base in Batumi.

Clay behaves badly when wet

Plots above the highway sit on slopes with clay soil, and clay swells, holds water and moves. So geology here is not a formality but the line that determines the foundation and the retaining works. We do it before the sketch, because redesigning a house around a survey done later means paying for the design twice and sometimes for a foundation that cannot be used.

Water on the plot comes before the pit

Runoff from above has to be intercepted and taken away in an organised way before the excavation. Otherwise the pit fills during the first heavy autumn, the sides slump and the schedule slips by weeks at the most expensive stage of the build. Channels, drainage and the discharge route are set out on the plan before anything is dug.

Designing for a guest property

Much of what is built here is meant to earn. The number of rentable rooms, hot water for simultaneous draw-off and electrical capacity for peak season are worked out before the architecture is fixed, using the figures from properties we manage nearby.

Documents, timing and warranty

Design, permit, commissioning and the registry entry are on us, including checking the zone and coefficient before purchase. Design and permit one to three months, then seven to nine months of works. Five-year warranty on the structure.

All services: Chakvi.

How we work

  1. 1Plot and documents
  2. 2Design and estimate
  3. 3Foundation and shell
  4. 4Engineering and finishing
  5. 5Handover

Services: Construction in Chakvi

House construction

Private houses in block with a monolithic frame: geology, foundation, structure, engineering and finishing. Five-year warranty on the…

Extensions and added floors

Extending an existing house with a structural survey and full documentation, including the change of area in the…

Commercial construction

Guest houses, small hotels and apart-buildings: layout planned from the economics, not from the square metres.

Facades and roofing

Roofs, gutters and facade systems built for two thousand millimetres of rain, salt air and horizontal storms.

Timber frame houses

A house closed within one warm season: lighter structure, simpler foundation, easier delivery to difficult plots. Kiln-dried timber…

Retaining walls and slopes

Terracing, retaining structures and drainage. On a slope this is structural work, and it comes before the excavation.

Fences and landscaping

Fences, driveways, paths, drainage and outdoor lighting — the part of a plot that decides how it looks…

Reconstruction

Rebuilding old houses and changing a building's use: survey first, then two estimates — rebuild or demolish and…

Landscaping works

Terraced gardens, lawns, planting, irrigation and path lighting for a subtropical plot that grows fast all year.

The same service in other cities

All about the service: Construction

Our properties: Chakvi

Frequent questions

Why is geology essential on clay?

Clay swells when wet and moves. The foundation type and the retaining works are calculated from the survey, not from experience on a neighbouring plot.

When should drainage be done?

Before the excavation. Otherwise the pit fills in autumn, the sides slump and the schedule slips at the most expensive stage.

Can you check the plot before purchase?

Yes: zone and coefficient, slope, ground, water and access for machinery.

How many rooms should a guest property have?

We calculate from the economics before the architecture is fixed, using figures from properties we manage nearby.

How long does a house take?

Seven to nine months of works after the permit, plus one to three for design and approval.