Request a callback

We will call back during working hours

By sending the form you agree to our privacy policy. We reply during working hours.

Mestia

Construction in Mestia

We quote by phone: the price depends on the property, scope and timing

Leave a request

We build private houses and guest properties in Mestia: design, permit, foundation, structure, engineering and finishing. We work by project, with materials delivered in batches and the crew on site.

Restrictions before design

Protected zones can limit height, materials and even the roof shape and facade treatment. We check what is permitted on the specific plot before the sketch, because designing first and finding out afterwards means paying for a project that cannot be approved. Where a restriction is genuinely limiting we say so plainly rather than proposing something that will be refused.

Structure for the mountains

Roof calculated for snow load with the shedding planned away from the entrance and parking, foundation below the freezing depth, a properly insulated envelope and pipework protected against freezing during long power cuts. These come before anything decorative, because none of them can be corrected later.

Guest properties

A bathroom per room, hot water for simultaneous draw-off, a drying area for clothes and boots and sound insulation between rooms are designed from the start. Guests arrive off the trails wet and late, and those four things are what appear in reviews. Retrofitting them into a finished building rarely works.

Logistics

Deliveries are long and planned in batches, with the cost shown as a separate line in the estimate rather than folded into the rates. The crew lives on site so a stage is closed in one go.

Documents, timing and warranty

Design, permit and commissioning are on us. Main works in the warm season. Five-year warranty on the structure.

All services: Mestia.

How we work

  1. 1Plot and documents
  2. 2Design and estimate
  3. 3Foundation and shell
  4. 4Engineering and finishing
  5. 5Handover

Services: Construction in Mestia

House construction

Private houses in block with a monolithic frame: geology, foundation, structure, engineering and finishing. Five-year warranty on the…

Extensions and added floors

Extending an existing house with a structural survey and full documentation, including the change of area in the…

Commercial construction

Guest houses, small hotels and apart-buildings: layout planned from the economics, not from the square metres.

Facades and roofing

Roofs, gutters and facade systems built for two thousand millimetres of rain, salt air and horizontal storms.

Timber frame houses

A house closed within one warm season: lighter structure, simpler foundation, easier delivery to difficult plots. Kiln-dried timber…

Retaining walls and slopes

Terracing, retaining structures and drainage. On a slope this is structural work, and it comes before the excavation.

Fences and landscaping

Fences, driveways, paths, drainage and outdoor lighting — the part of a plot that decides how it looks…

Reconstruction

Rebuilding old houses and changing a building's use: survey first, then two estimates — rebuild or demolish and…

Landscaping works

Terraced gardens, lawns, planting, irrigation and path lighting for a subtropical plot that grows fast all year.

The same service in other cities

All about the service: Construction

Frequent questions

What restrictions apply in protected zones?

Height, materials and sometimes roof shape and facade treatment. We check what is permitted on the specific plot before the design.

What is essential for a guest property?

A bathroom per room, hot water for simultaneous draw-off, a drying area and sound insulation. These are designed in, not added later.

How is logistics handled?

Deliveries in batches with the crew on site, and the cost shown as a separate line rather than folded into the rates.

Why does snow shedding matter at design stage?

Because the entrance and parking have to stay usable all winter, and the roof geometry decides where the snow lands.

When can the work be done?

The main volume in the warm season, with the road and weather deciding what is possible outside it.