Request a call back

We will call back during working hours

Right after sending, your phone will dial the company number so you can discuss the price by voice. By pressing the button you agree to the data processing policy.

Gonio

Construction in Gonio

We quote by phone: the price depends on the property, scope and timing

Leave a request

We build private houses, guest houses and small apart-buildings in Gonio: design, permit, foundation, structure, engineering and finishing. Twenty minutes from our base in Batumi.

Layout from the economics

Most builds here are meant to earn, so the layout is designed from the economics rather than from the total area. Six modest rooms with their own bathrooms usually outperform four spacious ones, and an extra bathroom pays for itself faster than an extra ten square metres of bedroom. We work this through using the figures from the properties we manage nearby, before the architecture is fixed rather than after the drawings are approved.

What is engineered differently from a family house

Hot water for simultaneous draw-off — everyone showers within the same two hours after the beach, and a tank sized for a family fails in the first full week of July. Electrical capacity for peak season with every air conditioner running. Sound between rooms. Separate entrances where the format allows. And storage for linen and consumables, which is always missing from the plan and always needed from day one.

The details that appear in reviews

A place for suitcases in every room, hooks in the bathroom, sockets by the bed, blackout curtains, somewhere to dry towels. None of them costs much at design stage and all of them end up in guest ratings.

Documents, timing and warranty

Design, permit, commissioning and the registry entry are on us. Design and permit one to three months, then seven to nine months of works. Five-year warranty on the structure.

All services: Gonio.

How we work

  1. 1Plot and documents
  2. 2Design and estimate
  3. 3Foundation and shell
  4. 4Engineering and finishing
  5. 5Handover

Services: Construction in Gonio

House construction

House construction

Private houses in block with a monolithic frame: geology, foundation, structure, engineering and finishing. Five-year warranty on the…

Extensions and added floors

Extensions and added floors

Extending an existing house with a structural survey and full documentation, including the change of area in the…

Commercial construction

Commercial construction

Guest houses, small hotels and apart-buildings: layout planned from the economics, not from the square metres.

Facades and roofing

Facades and roofing

Roofs, gutters and facade systems built for two thousand millimetres of rain, salt air and horizontal storms.

Timber frame houses

Timber frame houses

A house closed within one warm season: lighter structure, simpler foundation, easier delivery to difficult plots. Kiln-dried timber…

Retaining walls and slopes

Retaining walls and slopes

Terracing, retaining structures and drainage. On a slope this is structural work, and it comes before the excavation.

Fences and landscaping

Fences and landscaping

Fences, driveways, paths, drainage and outdoor lighting — the part of a plot that decides how it looks…

Reconstruction

Reconstruction

Rebuilding old houses and changing a building's use: survey first, then two estimates — rebuild or demolish and…

Landscaping works

Landscaping works

Terraced gardens, lawns, planting, irrigation and path lighting for a subtropical plot that grows fast all year.

The same service in other cities

All about the service: Construction

Our properties: Gonio

Frequent questions

How many rooms should I build?

We calculate from the economics and the season, not from the area. Often more small rooms with their own bathrooms earn more than fewer large ones.

What is most often underestimated?

Hot water and electrical capacity at peak. Both are designed for simultaneous use, otherwise they fail in July.

Can you build and then run the property?

Yes. After commissioning we outfit it and take it under management if you want.

What do guests actually complain about?

Hot water, noise between rooms and nowhere to put a suitcase. All three are layout decisions, not furniture ones.

Why plan storage for linen at design stage?

Because it is always needed from the first week and there is never a spare room to convert later.