Request a callback

We will call back during working hours

By sending the form you agree to our privacy policy. We reply during working hours.

Kutaisi

Construction and reconstruction in Kutaisi

We quote by phone: the price depends on the property, scope and timing

Leave a request

We build private houses and carry out reconstruction in Kutaisi: design, permit, foundation, structure, engineering and finishing, plus extensions, added floors and small commercial buildings.

Working with what already exists

The main demand here is not new build on empty land but reconstruction: an old house rebuilt, a floor added, a building converted into apartments near the centre. So a project almost always starts with a survey — a trial pit at the foundation, the condition of walls and floors, moisture, cracks — and we prepare two estimates so you can compare reconstruction against demolition and a new build. Sometimes demolition is cheaper and gives a better result, and we say so with figures.

Documents are the recurring obstacle

Older properties often carry unregistered extensions and a floor area that does not match the registry. That surfaces at sale and at bank valuation, and adding a new extension on top of an unregistered one compounds the problem. We compare the documents with the actual building at the survey stage and say what can be legalised.

Conversions near the centre

Turning a house or a floor into apartments changes the engineering: separate metering, sound between units, hot water for simultaneous use and, where the format allows, separate entrances. These are designed rather than improvised, because retrofitting them into a finished conversion rarely works.

Documents, timing and warranty

Design, permit, commissioning and the registry update are on us. A house seven to nine months, reconstruction from three depending on condition. Five-year warranty on the structure.

All services: Kutaisi.

How we work

  1. 1The call
  2. 2Plot check
  3. 3Design and estimate
  4. 4Permit
  5. 5Foundation and shell
  6. 6Engineering and finishing
  7. 7Handover

Services: Construction in Kutaisi

House construction

Private houses in block with a monolithic frame: geology, foundation, structure, engineering and finishing. Five-year warranty on the…

Extensions and added floors

Extending an existing house with a structural survey and full documentation, including the change of area in the…

Commercial construction

Guest houses, small hotels and apart-buildings: layout planned from the economics, not from the square metres.

Facades and roofing

Roofs, gutters and facade systems built for two thousand millimetres of rain, salt air and horizontal storms.

Timber frame houses

A house closed within one warm season: lighter structure, simpler foundation, easier delivery to difficult plots. Kiln-dried timber…

Retaining walls and slopes

Terracing, retaining structures and drainage. On a slope this is structural work, and it comes before the excavation.

Fences and landscaping

Fences, driveways, paths, drainage and outdoor lighting — the part of a plot that decides how it looks…

Reconstruction

Rebuilding old houses and changing a building's use: survey first, then two estimates — rebuild or demolish and…

Landscaping works

Terraced gardens, lawns, planting, irrigation and path lighting for a subtropical plot that grows fast all year.

The same service in other cities

All about the service: Construction

Frequent questions

Reconstruct the old building or demolish it?

We give both estimates after the survey. Reconstruction sometimes costs more and keeps the old ceiling heights and layout limits.

What do you check in the survey?

Foundation through a trial pit, walls, floors, roof, moisture and cracks. The report comes before the estimate.

Is approval needed for an added floor?

Yes. Any change of area or volume is approved and recorded in the registry, and we handle that.

Can a house be converted into apartments?

Yes, but the engineering changes: metering, sound, hot water and entrances are designed rather than added later.

What if the building has an unregistered extension?

We resolve it before new works. Adding another extension on top of it compounds the problem.