Request a call back

We will call back during working hours

Right after sending, your phone will dial the company number so you can discuss the price by voice. By pressing the button you agree to the data processing policy.

Shekvetili

Construction in Shekvetili

We quote by phone: the price depends on the property, scope and timing

Leave a request

We build private houses, guest properties and small apart-buildings in Shekvetili: design, permit, foundation, structure, engineering and finishing. An hour and a half from our base in Batumi.

Sandy ground under the pines

Plots sit by the forest on sandy ground with a high water table, so drainage around the house and plinth waterproofing are designed in from the start. The roof needs a genuine ventilation gap: under the pines humidity stays high all year and a sealed roof build-up collects condensation that rots the structure from inside. In autumn needles fill the gutters and valleys, so we detail them to shed rather than trap and we oversize the drainage.

Built for events as well as the beach

There is a concert venue and an amusement park nearby, and on event days everything is booked at a premium. Multi-room properties are therefore worth building here, and that changes the design: sound insulation between units, hot water for simultaneous draw-off, separate entrances, and storage for linen and supplies. We calculate the number of rentable rooms from the economics before the architecture is fixed.

Sound is a structural decision

Guests return late from concerts, and a thin partition costs the property its ratings for a whole season. Decoupled partitions and floor build-ups are planned at design stage, because retrofitting them costs room width and rarely happens.

Documents, timing and warranty

Design, permit, commissioning and the registry entry are on us. Design and permit one to three months, then seven to nine months of works. Five-year warranty on the structure.

All services: Shekvetili.

How we work

  1. 1Plot and documents
  2. 2Design and estimate
  3. 3Foundation and shell
  4. 4Engineering and finishing
  5. 5Handover

Services: Construction in Shekvetili

House construction

House construction

Private houses in block with a monolithic frame: geology, foundation, structure, engineering and finishing. Five-year warranty on the…

Extensions and added floors

Extensions and added floors

Extending an existing house with a structural survey and full documentation, including the change of area in the…

Commercial construction

Commercial construction

Guest houses, small hotels and apart-buildings: layout planned from the economics, not from the square metres.

Facades and roofing

Facades and roofing

Roofs, gutters and facade systems built for two thousand millimetres of rain, salt air and horizontal storms.

Timber frame houses

Timber frame houses

A house closed within one warm season: lighter structure, simpler foundation, easier delivery to difficult plots. Kiln-dried timber…

Retaining walls and slopes

Retaining walls and slopes

Terracing, retaining structures and drainage. On a slope this is structural work, and it comes before the excavation.

Fences and landscaping

Fences and landscaping

Fences, driveways, paths, drainage and outdoor lighting — the part of a plot that decides how it looks…

Reconstruction

Reconstruction

Rebuilding old houses and changing a building's use: survey first, then two estimates — rebuild or demolish and…

Landscaping works

Landscaping works

Terraced gardens, lawns, planting, irrigation and path lighting for a subtropical plot that grows fast all year.

The same service in other cities

All about the service: Construction

Frequent questions

Is it worth building several rentable rooms here?

Often yes: on event days everything is occupied at a premium. We calculate the economics before the design.

Why does the roof need a ventilation gap?

Under the pine forest humidity is high all year, and a sealed build-up collects condensation that rots the structure.

What is designed differently for multi-room properties?

Sound insulation between units, hot water for simultaneous use, separate entrances and storage for linen.

What do pine needles change?

They fill gutters and valleys every autumn, so the drainage is oversized and the valleys detailed to shed rather than trap.

Can sound insulation be added later?

Rarely. It costs room width and is planned at design stage instead.