Request a call back

We will call back during working hours

Right after sending, your phone will dial the company number so you can discuss the price by voice. By pressing the button you agree to the data processing policy.

Green Cape

Construction on Green Cape

We quote by phone: the price depends on the property, scope and timing

Leave a request

We build private houses, villas and guest properties on Green Cape: design, permit, foundation, structure, engineering and finishing. Twelve kilometres from our base in Batumi.

Access is the first question, not the last

The roads are narrow and steep, and a concrete mixer or crane truck cannot reach every plot. That changes the whole estimate: a concrete pump, delivery in smaller loads, hand carrying for the last stretch, or a lighter timber frame structure instead of block. We check it at the site visit and put the logistics in the estimate from the start, because on a difficult plot it can be a noticeable share of the budget and it belongs in the figure you decide on.

Water, slope and vegetation

The botanical garden is next door, the slope holds moisture and ground water is close. Geology, drainage and retaining structures are designed as part of the build rather than added later, and the house is set out so surface water from above is intercepted before it reaches the plinth. A house here without organised drainage shows it by the second winter.

Designing for the humidity

Ventilation with fresh air intake, a ventilated roof build-up, facade materials specified for damp and biological growth, and generous overhangs. These are cheap at design stage and expensive to retrofit, and they decide how the house looks after five years.

Documents, timing and warranty

Design, permit, commissioning and the registry entry are on us, including checking the zone and coefficient before purchase. Seven to nine months of works after the permit. Five-year warranty on the structure.

All services: Green Cape.

How we work

  1. 1Plot and documents
  2. 2Design and estimate
  3. 3Foundation and shell
  4. 4Engineering and finishing
  5. 5Handover

Services: Construction in Green Cape

House construction

House construction

Private houses in block with a monolithic frame: geology, foundation, structure, engineering and finishing. Five-year warranty on the…

Extensions and added floors

Extensions and added floors

Extending an existing house with a structural survey and full documentation, including the change of area in the…

Commercial construction

Commercial construction

Guest houses, small hotels and apart-buildings: layout planned from the economics, not from the square metres.

Facades and roofing

Facades and roofing

Roofs, gutters and facade systems built for two thousand millimetres of rain, salt air and horizontal storms.

Timber frame houses

Timber frame houses

A house closed within one warm season: lighter structure, simpler foundation, easier delivery to difficult plots. Kiln-dried timber…

Retaining walls and slopes

Retaining walls and slopes

Terracing, retaining structures and drainage. On a slope this is structural work, and it comes before the excavation.

Fences and landscaping

Fences and landscaping

Fences, driveways, paths, drainage and outdoor lighting — the part of a plot that decides how it looks…

Reconstruction

Reconstruction

Rebuilding old houses and changing a building's use: survey first, then two estimates — rebuild or demolish and…

Landscaping works

Landscaping works

Terraced gardens, lawns, planting, irrigation and path lighting for a subtropical plot that grows fast all year.

The same service in other cities

All about the service: Construction

Frequent questions

A concrete mixer cannot reach the plot. Can you still build?

Yes, with a concrete pump, smaller deliveries or a lighter structure. It is priced at the site visit rather than announced halfway through.

Is geology necessary here?

Yes. The slope, moisture and ground water decide the foundation type and the retaining works, which are the biggest line in the budget.

Can you check the plot before purchase?

Yes: zone, coefficient, slope, water, access and distance to utilities.

Why do facades go green here?

High humidity and dense vegetation. Coatings with biocide protection and generous overhangs are specified at design stage.

Would a timber frame house be better on a difficult plot?

Often yes: lighter foundation and easier delivery. We give both estimates and let you compare.