Request a call back

We will call back during working hours

Right after sending, your phone will dial the company number so you can discuss the price by voice. By pressing the button you agree to the data processing policy.

Poti

Construction in Poti

We quote by phone: the price depends on the property, scope and timing

Leave a request

We build private houses, small commercial buildings and warehouses in Poti: design, permit, foundation, structure, engineering and finishing. An hour and a half from our base in Batumi.

Geology is the project, not a formality

The city stands on water: weak soils and a high water table. The survey determines whether piles are needed or a slab will do, how deep, and how the drainage is arranged — and skipping it is exactly what produces the settlement cracks visible across the city. Where the ground turns out to require piles we say so with the figures rather than proposing a cheaper foundation that will move.

Basements and plinths

A basement is out of the question in most cases. The plinth waterproofing is designed as a system — membrane, protection layer, drainage, discharge — rather than a coat of bitumen applied on site, because it cannot be corrected once the building is up.

Commercial buildings

We check available electrical capacity before the design: equipment often needs more than the network at that address can supply, and finding that out after the lease or the purchase is a costly discovery. Floor slabs are calculated for the actual equipment rather than a general figure, and drainage for a workshop or kitchen is designed rather than added.

Documents, timing and warranty

Design, permit, commissioning and the registry entry are on us. Design and permit one to three months, then seven to nine months of works. Five-year warranty on the structure.

All services: Poti.

How we work

  1. 1Plot and documents
  2. 2Design and estimate
  3. 3Foundation and shell
  4. 4Engineering and finishing
  5. 5Handover

Services: Construction in Poti

House construction

House construction

Private houses in block with a monolithic frame: geology, foundation, structure, engineering and finishing. Five-year warranty on the…

Extensions and added floors

Extensions and added floors

Extending an existing house with a structural survey and full documentation, including the change of area in the…

Commercial construction

Commercial construction

Guest houses, small hotels and apart-buildings: layout planned from the economics, not from the square metres.

Facades and roofing

Facades and roofing

Roofs, gutters and facade systems built for two thousand millimetres of rain, salt air and horizontal storms.

Timber frame houses

Timber frame houses

A house closed within one warm season: lighter structure, simpler foundation, easier delivery to difficult plots. Kiln-dried timber…

Retaining walls and slopes

Retaining walls and slopes

Terracing, retaining structures and drainage. On a slope this is structural work, and it comes before the excavation.

Fences and landscaping

Fences and landscaping

Fences, driveways, paths, drainage and outdoor lighting — the part of a plot that decides how it looks…

Reconstruction

Reconstruction

Rebuilding old houses and changing a building's use: survey first, then two estimates — rebuild or demolish and…

Landscaping works

Landscaping works

Terraced gardens, lawns, planting, irrigation and path lighting for a subtropical plot that grows fast all year.

The same service in other cities

All about the service: Construction

Frequent questions

Is geology really necessary?

In Poti, yes. Weak soils and high water decide between piles and a slab, and skipping the survey is what causes settlement cracks.

Can I build a basement?

In most cases no. The cost of doing it properly exceeds building the same area above ground.

What is checked for a commercial building?

Available electrical capacity and ventilation before the design, plus floor slab loading for the actual equipment.

What if the ground requires piles?

We say so with the figures rather than proposing a cheaper foundation that will move within a few years.

How is the plinth waterproofed?

As a system — membrane, protection, drainage and discharge — because it cannot be corrected once the building is up.