Kobuleti

Construction in Kobuleti

We quote by phone: the price depends on the property, scope and timing

Leave a request

We build private houses, guest properties and small apart-buildings in Kobuleti: design, permit, foundation, structure, engineering and finishing. Thirty kilometres from Batumi.

The basement conversation

The whole strip along the shore has a high water table, and that produces one recurring discussion. A basement here is usually a bad idea: waterproofing it properly costs more than building the same area above ground, and if the work is done cheaply the basement is wet within two years and stays that way. We say this before the design rather than after the excavation, and we show two estimates so the decision is yours with the numbers in front of you.

Foundation follows the survey

Geology first, then a slab or piles with plinth waterproofing and drainage around the house. Skipping the survey to save money here is the most expensive saving available: flat ground near the sea is not simple ground, and the foundation type cannot be guessed from the neighbour’s house.

Designing a property that earns

Where the build is for rental we work out the number of rentable units, hot water for simultaneous draw-off and electrical capacity for peak before the architecture is fixed. A seasonal property should be finished in April rather than June: bookings, outfitting and photography all need time before the season, and a building that opens mid-season loses most of its first year.

Documents, timing and warranty

Design, permit, commissioning and the registry entry are on us. Design and permit one to three months, then seven to nine months of works. Five-year warranty on the structure.

All services: Kobuleti.

How we work

  1. 1Plot and documents
  2. 2Design and estimate
  3. 3Foundation and shell
  4. 4Engineering and finishing
  5. 5Handover

Services: Construction in Kobuleti

House construction

House construction

Private houses in block with a monolithic frame: geology, foundation, structure, engineering and finishing. Five-year warranty on the…

Extensions and added floors

Extensions and added floors

Extending an existing house with a structural survey and full documentation, including the change of area in the…

Commercial construction

Commercial construction

Guest houses, small hotels and apart-buildings: layout planned from the economics, not from the square metres.

Facades and roofing

Facades and roofing

Roofs, gutters and facade systems built for two thousand millimetres of rain, salt air and horizontal storms.

Timber frame houses

Timber frame houses

A house closed within one warm season: lighter structure, simpler foundation, easier delivery to difficult plots. Kiln-dried timber…

Retaining walls and slopes

Retaining walls and slopes

Terracing, retaining structures and drainage. On a slope this is structural work, and it comes before the excavation.

Fences and landscaping

Fences and landscaping

Fences, driveways, paths, drainage and outdoor lighting — the part of a plot that decides how it looks…

Reconstruction

Reconstruction

Rebuilding old houses and changing a building's use: survey first, then two estimates — rebuild or demolish and…

Landscaping works

Landscaping works

Terraced gardens, lawns, planting, irrigation and path lighting for a subtropical plot that grows fast all year.

The same service in other cities

All about the service: Construction

Our properties: Kobuleti

Frequent questions

Can I build a basement?

Technically yes, but with a high water table it costs more than the same area above ground and often stays damp. We show both estimates and let you choose.

Why is geology needed on flat ground?

Because the water table and the soil decide the foundation. Flat does not mean simple here, and the neighbour's house is not a guide.

When should a guest property be finished?

April. Bookings, outfitting and photography need time before the season starts.

How many rooms should I build?

We calculate from the economics and the season rather than from the total area, before the architecture is fixed.

Do you handle the permit?

Yes: design, municipal approval, commissioning and the registry entry.