Request a callback

We will call back during working hours

By sending the form you agree to our privacy policy. We reply during working hours.

Keda

Construction in Keda

We quote by phone: the price depends on the property, scope and timing

Leave a request

We build private houses and guest properties in Keda: design, permit, foundation, structure, engineering and finishing. An hour from our base in Batumi along the mountain road.

The land comes first

Many plots here are agricultural, and a residential house cannot always be built on them, or not in the volume you have in mind. That question is answered from the documents in a few days and saves considerably more than it costs. Where the status can be changed we say what it involves and how long it takes; where it cannot, we say that too, before the deposit rather than after.

Access sets the cost of everything

A beautiful plot with no proper road means expensive logistics for the entire build: every delivery, every machine, every utility connection. Sometimes a lighter timber frame structure is the sensible answer because it can be delivered by small transport. We check whether a concrete mixer can reach the site before the design, not after.

Mountain climate in the structure

A roof rated for snow load with the shedding planned away from the entrance, a foundation below the freezing depth, an insulated envelope and protected pipework. A house designed by coastal habits is expensive to heat here and awkward to use in winter, and that is not something finishes can correct.

Documents, timing and warranty

Design, permit, commissioning and the registry entry are on us, including checking the designation and zone before you buy. Seven to nine months of works after the permit; logistics shown separately. Five-year warranty on the structure.

All services: Keda.

How we work

  1. 1Plot and documents
  2. 2Design and estimate
  3. 3Foundation and shell
  4. 4Engineering and finishing
  5. 5Handover

Services: Construction in Keda

House construction

Private houses in block with a monolithic frame: geology, foundation, structure, engineering and finishing. Five-year warranty on the…

Extensions and added floors

Extending an existing house with a structural survey and full documentation, including the change of area in the…

Commercial construction

Guest houses, small hotels and apart-buildings: layout planned from the economics, not from the square metres.

Facades and roofing

Roofs, gutters and facade systems built for two thousand millimetres of rain, salt air and horizontal storms.

Timber frame houses

A house closed within one warm season: lighter structure, simpler foundation, easier delivery to difficult plots. Kiln-dried timber…

Retaining walls and slopes

Terracing, retaining structures and drainage. On a slope this is structural work, and it comes before the excavation.

Fences and landscaping

Fences, driveways, paths, drainage and outdoor lighting — the part of a plot that decides how it looks…

Reconstruction

Rebuilding old houses and changing a building's use: survey first, then two estimates — rebuild or demolish and…

Landscaping works

Terraced gardens, lawns, planting, irrigation and path lighting for a subtropical plot that grows fast all year.

The same service in other cities

All about the service: Construction

Frequent questions

Can I build on agricultural land?

Not always, and not in any volume. We check the designation and whether the status can be changed before the deposit.

Why does access matter more than the price of the plot?

Because it sets the cost of the whole build: material deliveries, machinery, utility connections.

What is different about a mountain house?

Insulation, a roof for snow load with planned shedding, a deeper foundation and protected pipework.

Would a timber frame house suit a difficult plot?

Often yes: lighter foundation and delivery by small transport. We give both estimates.

Is there a surcharge for the distance?

Yes, shown as a separate line so you can see what the logistics actually cost.