Request a call back

We will call back during working hours

Right after sending, your phone will dial the company number so you can discuss the price by voice. By pressing the button you agree to the data processing policy.

Ureki

Construction in Ureki

We quote by phone: the price depends on the property, scope and timing

Leave a request

We build private houses, guest properties and small apart-buildings in Ureki: design, permit, foundation, structure, engineering and finishing. An hour and a half from our base in Batumi, working in shifts with materials delivered in batches.

Sandy ground, high water

Two conclusions follow. The foundation is chosen from the survey rather than by analogy with a neighbour’s house — sand behaves differently from clay and the water table varies across short distances. And a basement is almost always a bad idea: waterproofing it properly costs more than the same area above ground, and done cheaply it is wet within two years.

Designed for the family market

Properties here are rented by the week, often to two families at once. So the layout is planned for that: the number of beds, a second bathroom, a kitchen that can cook for six, storage for prams and beach gear, and shade in the yard. We work the room count through against the economics before the architecture is fixed, using figures from properties we manage nearby.

Hot water and sand

Hot water is sized for everyone showering after the beach within the same hour rather than for an average family. And the entrance zone is designed as a filter — somewhere to leave shoes and rinse feet — because the magnetic sand otherwise travels through the whole house.

Documents, timing and warranty

Design, permit, commissioning and the registry entry are on us. Design and permit one to three months, then seven to nine months of works. A seasonal property should be finished in April. Five-year warranty on the structure.

All services: Ureki.

How we work

  1. 1Plot and documents
  2. 2Design and estimate
  3. 3Foundation and shell
  4. 4Engineering and finishing
  5. 5Handover

Services: Construction in Ureki

House construction

House construction

Private houses in block with a monolithic frame: geology, foundation, structure, engineering and finishing. Five-year warranty on the…

Extensions and added floors

Extensions and added floors

Extending an existing house with a structural survey and full documentation, including the change of area in the…

Commercial construction

Commercial construction

Guest houses, small hotels and apart-buildings: layout planned from the economics, not from the square metres.

Facades and roofing

Facades and roofing

Roofs, gutters and facade systems built for two thousand millimetres of rain, salt air and horizontal storms.

Timber frame houses

Timber frame houses

A house closed within one warm season: lighter structure, simpler foundation, easier delivery to difficult plots. Kiln-dried timber…

Retaining walls and slopes

Retaining walls and slopes

Terracing, retaining structures and drainage. On a slope this is structural work, and it comes before the excavation.

Fences and landscaping

Fences and landscaping

Fences, driveways, paths, drainage and outdoor lighting — the part of a plot that decides how it looks…

Reconstruction

Reconstruction

Rebuilding old houses and changing a building's use: survey first, then two estimates — rebuild or demolish and…

Landscaping works

Landscaping works

Terraced gardens, lawns, planting, irrigation and path lighting for a subtropical plot that grows fast all year.

The same service in other cities

All about the service: Construction

Frequent questions

Can I build a basement here?

Almost never worth it: sandy ground with high water makes proper waterproofing more expensive than building the same area above ground.

What should the layout allow for?

Week-long family stays: beds, a second bathroom, a proper kitchen, storage and shade in the yard.

How do you work at this distance?

In shifts, with materials delivered in batches and a weekly photo report. Distance does not stretch the schedule.

How is hot water sized?

For everyone showering after the beach within the same hour, not for an average family.

Why design an entrance zone?

The magnetic sand otherwise travels through the whole house. A place to leave shoes and rinse feet solves most of it.