We renovate houses, guest properties and apartments in Grigoleti: preparation for the season, full renovation, finishing. An hour and a half from our base in Batumi, working in shifts.
Sandy ground and a high water table
These produce the same recurring problem: a damp plinth and a foundation without waterproofing. Renovating over it is pointless — finishes on the lower floor come away within a season or two and the work is repeated at your expense. So we start with drainage and waterproofing, measure the moisture in the structure with instruments, and only then move on to the interior. The readings go into the report before the estimate so the scope is not a surprise halfway through.
Closed for eight months under pines
Humidity stays high all year and the season is short. A house shut from October to May needs designed ventilation rather than an open window in spring: intake, extraction with a humidity sensor, gaps behind furniture standing against external walls, and gutters that are clear when the autumn rain starts. Without that the owner arrives to mould in the wardrobes and a smell in the mattresses, and no cleaning fixes what stagnant air created over a winter.
A family resort
Bookings are long and guests come with children, so the layout is planned for that: beds, a second bathroom, a real kitchen, storage and shade. Practical beats decorative in what actually gets booked.
Timing and price
Season preparation two to four weeks, full renovation one and a half to three months. Planned for winter and spring: in summer the village is busy and deliveries slow down.
All services: Grigoleti.
