Request a callback

We will call back during working hours

By sending the form you agree to our privacy policy. We reply during working hours.

Gudauri

Renovation in Gudauri

We quote by phone: the price depends on the property, scope and timing

Leave a request

We renovate apartments, chalets and guest properties in Gudauri: finishing from a frame, full renovation, preparation for the winter season.

The building window is short

At roughly two thousand metres wet processes run from about May to October. Everything else is planned around that, and we say honestly at the outset whether a property can realistically be ready for the coming season or whether the following year is the sensible target. Starting a screed in October to meet a December date is how properties open unfinished, and we will not take that work on those terms.

Insulation is not an upgrade

A property with cold bridges cannot be heated through, and in winter guests notice it within the first evening. We check with a thermal camera and treat the envelope — walls, junctions, window installation, the floor over an unheated space — as part of the works rather than an option to be dropped when the budget tightens.

Power cuts and freezing

These are routine here. Pipework is insulated on the vulnerable runs and the heating is designed so a property survives several days unoccupied without freezing. For a rental unit that stands empty between bookings this is the difference between a cold week and a burst system found in spring.

What guests need in winter

A drying zone, storage for boards and skis, a warm bathroom and blackout curtains. Planned in the layout, not added later.

Timing and price

Frame finishing six to fourteen weeks within the working window. A property needed for December starts the previous spring. Logistics to altitude are shown separately in the estimate.

All services: Gudauri.

How we work

  1. 1Inspection and measurement
  2. 2Estimate and contract
  3. 3Rough works
  4. 4Finishing
  5. 5Handover and warranty

Services: Renovation in Gudauri

Apartment renovation

Renovation of apartments from a black or white frame and in older buildings: layout, engineering, finishing. Contract with…

House renovation

Renovation and reconstruction of private houses: roof, plinth, engineering, interiors. We start with the building envelope, not with…

Commercial interiors

Renovation of shops, offices, cafes and service spaces: schedule built backwards from the opening date, penalties for delay…

Turnkey renovation

From the first measurement to the keys: design, works, furniture, appliances and textiles. One contract, one team, one…

Interior design project

Layout, visualisation and a working specification you can build from: dimensions, materials, lighting and outlet plans, not just…

Electrical works

Full rewiring, distribution boards, outlets, lighting and connection of appliances. Calculated for the real load, not for the…

Smart home

A smart home for a flat, a house or a rental apartment: lighting, climate, smart locks, leak sensors…

Plumbing works

Water supply and drainage, manifolds, water heaters, connection of appliances. Everything that leaks later is decided at this…

Tiling

Tiling of bathrooms, kitchens, terraces and large format porcelain: setting-out, waterproofing underneath, even joints and sealed cuts.

Plastering and screed

Levelling walls and floors: beacons, plaster, screed with the right falls. Everything installed afterwards depends on this stage.

Ceilings

Suspended, multi-level and stretch ceilings with recessed lighting and hidden LED coves. Wiring and access are planned before…

Windows and balcony glazing

Panoramic glazing, balcony enclosures and window replacement: calculated for wind load, fitted with anti-corrosion hardware.

Heating and air conditioning

Underfloor heating, radiators, boilers and split systems: routes laid during the renovation, capacity calculated for the actual rooms.

Turnkey bathroom renovation

A bathroom from strip-out to hanging the mirror: waterproofing, plumbing, tiling, furniture and lighting under one contract.

Sound insulation

Insulating walls, ceilings and floors from neighbours and street noise: a proper build-up with decoupling, not a thin…

Layout changes and approvals

Moving or removing partitions with a structural check and full documentation, including the change in the public registry.

The same service in other cities

All about the service: Renovation

Frequent questions

When can the work be done?

Roughly May to October for wet processes. Outside that window only limited internal work is possible.

The apartment will not warm up. Why?

Cold bridges in the envelope rather than weak heating. A thermal camera shows where, and then insulation is the answer.

What happens during a long power cut?

Without protection the pipework freezes. We insulate the vulnerable runs and design the heating for an empty property.

Can you finish by December if we start in autumn?

Usually not, and we say so rather than starting a screed that will not dry. The following season is often the honest answer.

What do winter guests actually need?

A drying zone, storage for gear, a warm bathroom and blackout curtains. All layout decisions.