We renovate apartments, chalets and guest properties in Gudauri: finishing from a frame, full renovation, preparation for the winter season.
The building window is short
At roughly two thousand metres wet processes run from about May to October. Everything else is planned around that, and we say honestly at the outset whether a property can realistically be ready for the coming season or whether the following year is the sensible target. Starting a screed in October to meet a December date is how properties open unfinished, and we will not take that work on those terms.
Insulation is not an upgrade
A property with cold bridges cannot be heated through, and in winter guests notice it within the first evening. We check with a thermal camera and treat the envelope — walls, junctions, window installation, the floor over an unheated space — as part of the works rather than an option to be dropped when the budget tightens.
Power cuts and freezing
These are routine here. Pipework is insulated on the vulnerable runs and the heating is designed so a property survives several days unoccupied without freezing. For a rental unit that stands empty between bookings this is the difference between a cold week and a burst system found in spring.
What guests need in winter
A drying zone, storage for boards and skis, a warm bathroom and blackout curtains. Planned in the layout, not added later.
Timing and price
Frame finishing six to fourteen weeks within the working window. A property needed for December starts the previous spring. Logistics to altitude are shown separately in the estimate.